TM 10-4320-345-13
2-16. PREPARATION FOR MOVEMENT - cont.
(11) Remove coupling clamp (1) and disconnect check valve (2) from discharge port on 600 gpm
pump.
(12) Prepare 600 gpm pump for movement Refer to the applicable TM.
(13) Repeat steps (1) through (12) for remaining boost pumping stations.
Figure 2-40. Boost Pumping Station Disassembly.
2-90