TM 10-4320-346-12&PNOTE•Be sure to install all dust caps and plugs on the hose assemblies andfittings as they are dismantled.•Store hose assemblies and fittings in their original shipping boxes orother suitable containers for transportation.a.Close both elbow valves on coupler valve assemblies (16) installed into collapsible storage drums (1) andopen two valve assemblies (4).b.Disconnect two 2.00 in. dia. x 10 ft. long hose assemblies (3) from two collapsible water drums (1).c.Disconnect two 2.00 in. dia x 10 ft. long hose assemblies (7) and (8) from pump and engine assembly (2).d.Disconnect two ball valve assemblies (4) from y-fitting (5) and hose assembly (3).e.Remove 2.00 in. dia. x 10 ft long hose assembly (7) and adapter (6) from y-fitting (5).f.Disconnect four 1.50 in. dia x 25 ft. long hose assemblies (13), two 2.00 in. dia x 25 ft. Long hoseassemblies (10), and 2.00 in. dia x 10 ft. long hose assembly (8) from y-fittings (9) and (11).g.Remove four reducers (12) from y-fittings (11).h.Remove four nozzle assemblies (14) from four 1.50 in. dia. x 25 ft. long hose assemblies (13).i.Lift hose assemblies over the shoulder to create a siphoning action and walk the hose line to drain waterfrom all hoses. Remove valves and other fittings as you go and install caps and plugs into all dismantled components.j.Store hose assemblies and fittings in their original shipping boxes or other suitable containers fortransportation.2-11
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business