TM 10-4610-237-124.6CHECKINGUNPACKEDEQUIPMENT-Continued.b.UnpackingWaterTankChest. Refer to Figure 4- 1.(1)Unfasten eight latches (1).WARNINGThe top cover is heavy and difficult to handle. Two personnel arerequired to lift top cover from water tank chest.(2)Lift top cover (2) from water tank chest.(3)Move four handles (3) to OPEN position and remove end panel (4) from water tank chest. Repeat forother end panel.WARNINGThe side panels are heavy and difficult to handle. Two personnelare required to lift side panels from skid.(4) Unlatch four locking pins (5) and lift side panel (6) from skid (7).(5) Remove accessory components from water tank chest.(6)Lift divider pan (8) from skid (7).(7) Unfasten tie down straps (9) at both ends of water tank (11).WARNINGTo prevent injury to personnel and damage to equipment, a hoist,crane or similar type equipment having a minimum lifting capacityof 750 pounds must be used to lift water tank from skid.(8)Connect ends of two center hoisting straps (10) to hoist, crane or similar type equipment.(9)Lift water tank (11) from skid (7).c.UnpackWaterPumpandHypochlorinationUnit.(1)Locate hypochlorination unit in triple container.(2)Using forklift, remove hypochlorination unit from triple container.(3)Locate 125 gpm pump in triple container.(4)Using two personnel, remove 125 gpm pump from triple container.(5)Refer to the applicable TM and unpack 125 gpm pump.(6)Refer to the applicable TM and unpack hypochlorination unit.4-3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business