TM 10-4610-237-12
4.6
CHECKING UNPACKED EQUIPMENT - Continued.
d.
Checking Unpacked Equipment.
(1)
Inspect triple container and 20K water tank chest stencils, markings and information plates. All items
should be clear and readable.
(2)
Inspect the equipment for any damage incurred during shipment. If the equipment has been damaged,
report the damage on SF 364, Report of Discrepancy.
(3)
Inspect components to make sure they are in serviceable condition.
(4)
Check equipment against the packing slip to see if the shipment is complete. Report all discrepancies
in accordance with the instructions of DA Pam 738-750.
(5)
Check to see if the equipment has been modified.
e.
Processing Unpacked Equipment.
(1)
Remove all tape, paper wrapping, plastic sheeting and packing materials from the water system
components.
(2)
Refer to the applicable TM for processing and servicing the 125 gpm pump, hypochlorination unit, 20K
collapsible fabric tank, triple container and water tank chest.
Section IV. UNIT TROUBLESHOOTING PROCEDURES
4.7
INTRODUCTION.
This section provides the troubleshooting information for the 20K Water Storage and Distribution System at the Unit
Maintenance level. It consists of the symptom index, listing the most common malfunction symptoms, and the related
troubleshooting procedures. The procedures repeat the malfunctions, and provide the steps and corrective actions
necessary to return the system to operational readiness.
4.8
TROUBLESHOOTING.
a.
The troubleshooting procedures in this section cover the common malfunctions which you may find during
operation of the water system. You should perform the tests, inspections and corrective actions in the order
they appear in the procedures.
b.
This section cannot list all the malfunctions that may occur, all the tests or inspections needed to find the
fault, or all the corrective actions needed to correct the fault. If the equipment malfunction is not listed or
actions listed do not correct the fault, notify your supervisor.
c.
Refer to the applicable TM for troubleshooting malfunctions on the 125 gpm pump, hypochlorination unit,
20K collapsible fabric tank, triple container and water tank chest.
4-5