TM 10-4610-243-13
4-6.
CHECKING UNPACKED EQUIPMENT.
a.
General. The water system is packaged and shipped in 12 tricons and sixteen 50K water tank storage
chests. One 50K collapsible fabric tank is stored in each chest. All other components of the water system
are shipped in tricon containers. Where possible, save crating inside the tricon for reuse. It will make
repacking easier. When uncrating the equipment, keep in mind that the system is made up of different
connection kits. This manual addresses installation and use of all connection kits, but you may not need all
of these components to perform your mission. Your operating requirements will determine which connection
kits/components are needed to perform the mission.
b.
Unpacking 50K Water Tank Chests. Refer to figure 4-1
NOTE
Unpacking of one 50K water tank chest is shown Unpacking of remaining chests is
similar.
(1)
Unfasten eight latches (1)
WARNING
The top cover is heavy and difficult to handle. Two personnel are required to lift top
cover from water tank chest
(2)
Lift top cover (2) from water tank chest
(3)
Move four handles (3) to OPEN position and remove end panel (4) from water tank chest. Repeat for
other end panel.
WARNING
The side panels are heavy and difficult to handle Two personnel are required to lift side
panels from skid.
(4)
Unlatch foul locking pins (5) and lift side panel (6) front skid (7)
(5)
Remove accessory components from water tank chest.
(6)
lift divider pan (8) from skid (7)
(7)
Unfasten tie down straps (9) at both ends or water tank (11).
4-3