TM 10-4610-243-13Section I. REPAIR PARTS AND SPECIAL TOOLS LIST4-1.COMMON TOOLS AND EQUIPMENT.For authorized common tools and equipment, refer to the Modified Table of Organization and Equipment (MTOE), CTA50-970 or CTA 8-100, applicable to your unit.4-2.SPECIAL TOOLS, TMDE AND SUPPORT EQUIPMENT.Refer to the Maintenance Allocation Chart contained in Appendix B for maintenance tasks authorized at unit levelmaintenance and the TMDE and support equipment required to perform these tasks. No special tools are required tomaintain the 800K Water Storage and Distribution System.4-3.REPAIR PARTS.Repair parts are listed and illustrated in the repair parts and special tools list, TM10-4610-242-23P, covering unit, directsupport, and general support maintenance of this equipment.Section II. SERVICE UPON RECEIPT4-4.SITING.a.Transport. The water system is designed to be packaged and shipped inside the twelve tricons suppliedwith the system. Transport the water system only on equipment compatible with tricon transportrequirements (TM55-8145-200-13&P).b.SiteSelection. When selecting a site for installation of the water system, consider the overall operatingarea. Siting must include access to the main water source (TWDS), adequate space to set up 16 watertanks and associated hoses, and space for movement of water transport vehicles (minimum space required260 x 275 feet). Site should be level and provide good water drainage away from system components. Ifpossible, site should slope downhill from water source to water dispensing points.4-5.SHELTER REQUIREMENTS.The water system does not require special sheltering during normal operation. Heated shelters are required whenoperating in extremely cold conditions (below 32° F). Store unused water system components in the tricons to preventdamage and minimize routine maintenance.4-2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business