TM 10-4610-243-134-6. CHECKING UNPACKED EQUIPMEN'T - cont.e.ProcessingUnpackedEquipment.(1Remove all tape, paper wrapping, plastic sheeting and packing materials from the water system components.(2) Refer to the applicable TM for processing and servicing the 350 gpm pumps.(3) Refer to the applicable TM for processing and servicing the 125 gpm pumps.(4) Refer to the applicable TM for processing and servicing the hypochlorination units.(5) Refer to the applicable TM for processing the 50K collapsible fabric tanks.Section III. UNIT TROUBLESHOOTING PROCEDURES4-7. INTRODUCTION.This section provides the troubleshooting information for the 800K Water Storage and Distribution System at the UnitMaintenance level. It consists of the symptom index, listing the most common malfunction symptoms, and thetroubleshooting table, Table 4-1. This table repeats the malfunctions, and provides the procedural steps and correctiveactions necessary to return the system to operational readiness.4-8. TROUBLESIHOOTING.a.The troubleshooting table lists the common malfunctions which you may find during operation of the watersystem. You should perform the tests, inspections and corrective actions in the order they appear in the table.b.This table cannot list all the malfunctions that may occur, all the tests or inspections needed to find the fault, orall the corrective actions needed to correct the fault If the equipment malfunction is not listed or actions listed donot correct the fault, notify your supervisorc.Refer to the applicable TM for troubleshooting malfunctions on the 350 gpm pumps.dRefer to the applicable TM for troubleshooting malfunctions on the 125 gpm pump.eRefer to the applicable 'T'LM for troubleshooting malfunctions on the hypochlorination units.f.Refer to the applicable TM for troubleshooting malfunctions on the 50K collapsible fabric tanks.4-6
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business