TM 10-5430-240-13&P 0005 00 0005 00-1 OPERATOR, UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST) TANK, FABRIC, COLLAPSIBLE, WATER, 3,000 AND 5,000 GALLONS, SEMI-TRAILER MOUNTED OPERATION UNDER USUAL CONDITIONSASSEMBLY AND PREPARATION FOR USE Unpacking the Equipment1. When a new or used tank (1) is received, it must be uncrated. 2. Unload the crate (2) as near to its point of installation as possible. 3. Remove the nails from the crate top (3) and remove the top. CAUTION Remove all protruding nails and other objects prior to attempting to remove the tank from the container. This is essential in order to avoid puncturing the tank. 4. Using a suitable lifting device, attach to the lift straps (4) of the sling (5), and carefully lift tank (1) out of the crate (2), and transport the tank (1) to the designated point of installation. 5. The repair items (6) are in a box at the end of crate (2). The tie down assembly and pressure gage are packaged in the duffle bag (7). These items should be placed in a secure place until needed. Typical Crating Models PD62783-3000 and 91093
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business