Table 1. Operator Preventive Maintenance Checks and Services For 20,000
and 50,000 Gallon Collapsible Water Storage Tanks (continued).
ITEM
NO.
INTERVAL
MAN-
HOUR
ITEM TO BE
CHECKED
OR SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF:
23
After
Repair Kit (9)
Check for missing
components.
Repair items are
missing.
24
Weekly
Filler/Discharge
Assembly, Hose
Attachments and
Couplings (1, 4)
Inspect for damage,
leakage, and loose or
missing gaskets.
Fittings or hose
attachments are
damaged, loose
or leaking, or
gaskets are
missing.
25
Weekly
Tank (2)
Inspect for cuts, punctures
and leaks.
Tank is cut,
punctured or
leaking.
26
Weekly
Vent Fitting
Assembly (3)
Inspect vent fitting
assembly vent flap for
movement. Inspect vent
pipe assembly for leakage.
Vent flap sticks or
binds. Vent pipe
leaks or is
damaged.
27
Weekly
Gate/Ball Valve
Assembly (8)
Check for proper operation
and leakage.
Gate/ball valve
leaks or will not
open/close.
28
Weekly
Repair Kit (9)
Check for missing
components. Make sure
instruction information is
present.
Repair items are
missing.
29
Semi-
annually
Tank Interior (not
shown)
Check interior tank coating
for cracking.
Coating is
cracked, allowing
leakage.
END OF WORK PACKAGE