TM 10-5430-243-12&P 0013 000013 00-1/2 blank Change 1 – 28 April 2002 OPERATOR MAINTENANCE TANK, FABRIC, COLLAPSIBLE, WATER STORAGE, 20,000 AND 50,000 GALLONS FILLER/DISCHARGE BALL VALVE GASKET (RELIANCE AND MPC MODELS) REPLACEMENTINITIAL SETUP Mandatory Replacement Parts Gasket (Item 2, WP 0041 00) REMOVAL 1. Pull cam-lever arms (1) on dust cap (2) out, away from body of dust cap (2). 2. Remove dust cap (2) from male coupling (3). Remove gasket (4) from dust cap (2). 3. Pull cam-lever arms (5) on female coupling (6) out, away from body of female coupling (6). 4. Remove dust plug (7) from female coupling (6). Remove gasket (8) from dust plug (7). 5. Discard gaskets (4, 8). INSTALLATION 1. Install new gasket (8) on dust plug (7). 2. Push cam-lever arms (5) on female coupling (6) outward, away from body of female coupling (6). 3. Install dust plug (7) in female coupling (6). 4. Push cam-lever arms (5) on female coupling (6) inward toward body of female coupling (6) until locked. 5. Install new gasket (4) on dust cap (2). 6. Push cam-lever arms (1) on dust cap (2) outward, away from body of dust cap (2). 7. Install dust cap (2) on male coupling (3). 8. Push cam-lever arms (1) on dust cap (2) inward toward body of dust cap (2) until locked. END OF WORK PACKAGE1 2 3 4 567 8
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business