TM 10-5430-243-12&P
0011 00
0011 00-1/2 blank
Change 1 28 April 2002
OPERATOR AND UNIT MAINTENANCE MANUAL
(INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)
TANK, FABRIC, COLLAPSIBLE, WATER STORAGE,
20,000 AND 50,000 GALLONS
OPERATOR MAINTENANCE PROCEDURES
GENERAL INSTRUCTIONS
Operator maintenance is limited to the replacement of damaged or missing gaskets on all quick -
isconnect couplings and to performing emergency tank repairs using wood plugs and sealing clamps (WP
0006 00).
Maintenance instructions in this section will list resources and personnel required, for start of procedure,
except as noted below:
NOTE
Personnel required are listed only if the task requires more than one.
EQUIPMENT
MAINTENANCE PROCEDURE
Filler/Discharge Gate Valve (GTA Container Model), Hose Assembly....................................... WP 0012 00
Coupling and Dust Cap Gasket
Filler/Discharge Ball Valve Gasket (Reliance and MPC Models) ............................................... WP 0013 00
Vent Fitting Assembly Coupling and Dust Cap Gasket .............................................................. WP 0014 00
Filler/Discharge Assembly Elbow and Dust Cap Gasket ............................................................ WP 0015 00
END OF WORK PACKAGE