TM 5-3820-256-10
Table 2-14. Rig Frame/Jacks Preventive Maintenance Checks and Services
ITEM
INTERVAL
Item to be
Procedures
Equipment is
NO.
Inspected
Check for and have repaired
not ready/
B D A W M
or adjusted as necessary.
available if:
1
X
Frame lighting
For night transporting, check all
Clearance lights
clearance lights illuminate. Replace
are not illuminating.
bulbs as required.
2
X
Mud flaps
Check mud flaps are in good condition.
Replace worn out or damaged flaps.
3
X
Driller's and helper's
Check for broken welds. Repair minor
platform
damage; replace if extensively dama-
ged.
X
Check that locking bolts are in place.
4
X
Jacks and jack pads
Check jack pads for broken welds.
Check for leaks at hydraulic hose
connections.
5
X
Hand jack
Check operation; replace failed jack.
6
X
Rig frame
Check for broken welds. Report any
Frame has broken
damage to unit maintenance.
welds or structural
damage.
Table 2-15. Winch Preventive Maintenance Checks and Services
ITEM
INTERVAL
Item to be
Procedures
Equipment is
NO.
Inspected
Check for and have repaired
not ready/
B D A W M
or adjusted as necessary.
available if:
1
X
Winch covers
Check that props hold covers open
Radiator-protecting
during winch operation.
covers are not in
place.
X
Close covers.
2
X
Winch Cable
Check cable for breaks or separated
Wire rope is broken
strands.
or strands separa-
ted.
X
Lubricate cable.
3
X
Guide rollers
Check for cracks, loose bolts, and
free roller movement.
X
Lubricate zerk fittings.
4
X
Hydraulic motor
Check for leaks at hose connections.
Leakscannot be
stopped.
5
X
Control Valve
Check for proper operation.
Control fails to
Operate winch.
2-32
