top of well, then move vehicle forward enough to support the pump and motor with clamp at well.
y.
Remove the hose elevator clamp at support vehicle and reverse vehicle, unrolling more hose as needed. Attach
power cable and anchor hose to support vehicle as before.
z.
Repeat above procedure as many times as necessary to lower the pump and motor to 4 to 5 feet from bottom of
the well.
aa.
Assemble a clamp to hose at top of well casing, relieve tension on clamp at support vehicle, then cut drop hose
squarely with a sharp knife or hacksaw 10 to 12 inches above clamp at well. (Refer to figure 4-4).
ab.
Install the hose coupling in hose and assemble coupling clamp in the same manner as other hose end. (Refer to
steps a. through e.) ac. Unroll power cable to length necessary to reach starter panel and cut power cable.
Insert power cable through the smaller hole in well seal.
ad.
Assemble nipples to elbow and insert one nipple through well seal. Connect the nipple to hose with pipe
coupling. Install gate valve on other nipple.
ae.
Attach the auxiliary drum line to the elbow and lift assembly to raise clamp from atop well casing. Remove
clamp from hose.
Figure 4-4. Sealing Well
4-5
