on each lead to expose approximately 3/4 inch of wire.
e.
Insert the pump leads through the hole in bottom of panel.
f.
Connect the leads as follows: black to T1, red to T2, yellow to T3, and green to ground.
g.
Strip away approximately six inches of outer insulation from power source cable and strip away approximately
3/4 inch of insulation from each lead.
h.
Insert the power source cable through hole in side of panel and connect leads at Line 1, Line 2, Line 3 and
Ground.
i.
Close panel door and turn door locking screws to engage door locks.
Figure 4-5. Starter Panel Installation
4-8