CAUTION
Area must be absolutely dry and free of all solvent residue (especially in conductor strands)
before applying any tapes.
e.
Fill any connector indents with small pieces of semi-conducting tape. Tightly level wind tape across connector
area, overlapping 1/16 inch onto each edge of the penciled insulation. Form smooth concentric buildup, as
shown.
f.
Tightly half-lap splicing tape across connector area, building up to dimension (D) with a smooth taper along
distance (C), reaching maximum diameter over penciled insulation.
NOTE
Highly stretch and exactly half-lap tape to produce a void-free, uniform buildup.
g.
Tightly half-lap two layers of vinyl plastic electrical tape over entire splice, extending for one (1) inch onto each
cable jacket.
4-2 WATER PRODUCTION
4-2.1 Pump Starter Panel. (Figure 4-5)
a.
Attach starter panel to panel stands, using screws, lockwashers and nuts that are stored on panel standfoot.
b.
Stabilize the panel by placing sandbags on the stand feet or by driving stakes into the ground at holes in stand
feet.
c.
Turn the door locking screws one-half turn to disengage door locks. Open panel door.
d.
Cut outer insulation back on pump cable about twelve inches. Strip insulation
4-7