Home
Download PDF
Order CD-ROM
Order in Print
Section II. MAINTENANCE ALLOCATION CHART - TM-5-3825-225-14P_133
Section II. MAINTENANCE ALLOCATION CHART - TM-5-3825-225-14P_135
TM-5-3825-225-14P Drilling System Well Rotary Truck Mounted Air Transportable 600 Feet Capacity Model LP-12 NSN 3820-01-246-4276 Manual
Page Navigation
119
120
121
122
123
124
125
126
127
128
129
TM 5-3825-225-14&P
Section II. MAINTENANCE ALLOCATION CHART
1208
Air
Brake System
Lines
Replace
1.0
Repair
1.0
Brake Chambers
Replace
1.0
Quick Release Valve
Test
0.1
Replace
1.0
Reservoir
Service
0.5
Replace
0.5
13
WHEELS
1311
Wheel Assembly
Wheel Seals
Replace
0.5
Wheel
Bearings
Inspect
0.5
Adjust
0.2
Replace
0.5
Brakedrums
Replace
0.7
Repair
1.5
Hubs
Service
2.0
Replace
1.0
1313
Tires and Tubes
Tires and Tubes
Inspect
0.1
Service
0.1
Replace
0.5
Repair
1.5
15
FRAME AND TOWING
ATTACHMENTS
1501
Frame Assembly
Inspect
0.2
Repair
2.0
1506
Fifth Wheel
Kingpin and Fifth Wheel
Inspect
0.2
Plate
Service
0.2
Replace
0.5
1507
Landing Gear
Landing Gear
Inspect
0.2
Replace
4 0.
Repair
3.0
(5)
TOOLS
AND
EQUIP
(3)
MAINTENANCE
FUNCTION
(6)
REMARKS
(2)
COMPONENT
ASSEMBLY
(1)
GROUP
NUMBER
C
O
F
H
D
(4)
MAINTENANCE CATEGORY
B-4
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business