TM 5-3825-229-14&P
4-64. DISCHARGE VALVE (cont)
b.
Installation (cont).
(3)
Install cap (4) on discharge valve (2).
(4)
Refer to para. 2-6 and couple semitrailer to prime mover. Operate prime mover and pressurize air
system.
(5)
Refer to para. 2-20 and fill water tank.
Section XIII. PREPARATION FOR STORAGE AND SHIPMENT
Paragraph
Title
Page
Number
Number
4-65
GENERAL........................................................................................................................ 4-147
4-66
ADMINISTRATIVE STORAGE INSTRUCTIONS ............................................................ 4-147
4-67
SHIPPING INSTRUCTIONS ............................................................................................ 4-147
4-65. GENERAL
Commanders are responsible for ensuring that all material issued or assigned to their command is maintained in a
serviceable condition, properly cared for and that personnel under their command comply with technical instructions.
Lack of time, lack of trained personnel or lack of proper tools may result in a unit being incapable of performing
maintenance for which it is responsible. In such cases, unit commanders, with approval of major commanders, may
place material that is beyond the maintenance capability of the unit in administrative storage or return it to supply
agencies. When preparing the water distributor for administrative storage, the unit commander will be responsible for
processing the material, including all tools and equipment, in such a manner as to protect it against corrosion,
deterioration and physical damage during shipment or periods of administrative storage.
4-66. ADMINISTRATIVE STORAGE INSTRUCTIONS
Refer to TM 740-90-1.
4-67. SHIPPING INSTRUCTIONS
Preservation and other protective measures taken in the preparation of material and accompanying tools and equipment
for shipment must be sufficient to protect the material against deterioration and physical damage during shipment.
4-147