TM 5-3825-229-14&P
5-4. AXLES (cont)
b.
Installation (cont).
(7)
Torque lock nuts (13) to 300 Ib-ft (407 Nm) (dry).
(8)
Support rigid torque arm (12) in position between axle and front hanger. Secure torque arm to axle
and hanger with bolts (11) and lock nuts (1 0). Torque lock nuts to 250 Ib-ft (330 Nm) (dry).
(9)
Working on opposite side of semitrailer install delrin liner (8) and top plate (7) in spring (9) above front
axle (4).
(10)
Install two U-bolts (6) over springs and through hanger welded to axle (4).
(11)
Secure U-bolts (6) to axle hanger with lock nuts (5). Tighten lock nuts (5) to a torque of 300 Ib-ft (407
Nm) (dry).
(12)
Support adjustable torque arm (3) between front hanger and axle hanger. Secure torque arm with two
bolts (2), spacer (10) and lock nuts (1). Tighten lock nuts (1) to a torque of 250 Ib-ft (330 Nm) (dry).
(13)
Refer to para. 4-25 and install brake assemblies on axle assembly.
(14)
Refer to para. 4-36 and install seals and bearings, hub assembly and brake drums on axle assembly.
5-5