TM 5-3825-229-14&P5-4. AXLES (cont)b.Installation(cont).(15)Refer to para. 4-36 and install seals and bearings, hub assemblies and brake drums on axleassembly.(16)Refer to para. 4-26 and install slack adjusters and brake camshafts on axle assembly.(17)Refer to para. 4-28 and install brake chambers on axle assembly.(18)Raise rear of axle frame with floor jacks and remove jack stands or blocking. Lower semitrailer to reston wheels. Remove floor jacks.(19)Refer to para. 4-28 and connect air lines to top of brake chambers.(20)Check axle alignment (para. c below).c. AliqnmentofAxles.(1)Move the semitrailer forward and backward over a level surface two or three times with the lastmovement forward.Axle Alignment(2)Moving the semitrailer permits the suspension to become correctly aligned to center the front and rearwheel tracks.(3)Disconnect the tractor from the semitrailer. Refer to para. 2-23. Refer to para. 3-9 and cage brakechambers.(4)Raise or lower the front of the semitrailer with the landing legs to bring the semitrailer to a levelposition.5-6
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business