TM 5-3895-370-14&P
Table 4-1. Authorized Unit Support Tool Kits
Tool or Test
Equipment
Maintenance
Tool Kit
Ref Code
Level
Nomenclature
Stock Number
1
O, F, H
Tool kit, general mechanic's: automotive
5180-00-177-7033
2
O, F, H
Shop equipment, automotive maintenance and
4910-00-754-0653
repair: organizational maintenance
supplemental no. 1, less power
3
O, F, H
Shop equipment, automotive maintenance and
4910-00-754-0654
repair: organizational maintenance common
no. 1, less power
4
O, F, H
Test set, battery: AN/PSM-13
6625-00-868-8344
5
O, F, H
Multimeter, digital: AN/PSM-45
6625-01-265-6000
Section II. SERVICE UPON RECEIPT
Level A or level C methods are used to prepare the vehicle for shipment. The following procedures provide instructions
for unpacking and preparing the vehicle for use. These instructions will apply to both levels of preparation. Service Upon
Receipt instructions are divided into three areas: unpacking, inspection, and servicing.
4-4. UNPACKING UPON RECEIPT INSTRUCTIONS.
Components with unpainted and exposed surfaces are wrapped and taped to protect them during shipment. Packing
materials and tape must be removed from the following components before inspecting them:
Spraybar extensions
Instrument panel covers
Spraybar cylinder's piston rods
Radiator
Throttle control lever
Hydraulic coupling
Transmission control lever
Bituminous hoses and couplings
Valve bank assembly levers
Fifth-wheel and mounting bracket
Air restriction indicator
Torch assembly
4-5
