TM 5-3895-370-14&P(6) Install bushing (19) in frame half (10).(7) Install bushing (19) in other frame half (9).NOTEApply light coat of lubricating oil toinside of ratchet pawl prior toassembly.(8)Install spring (18), lockwasher (17), spacer (16),ratchet pawl (15), screw (14), and nut (13) onframe half (10). Tighten nut 24 to 27 lb-ft (33-37Nm).NOTE·Apply light coat of lubricating oil to bushings prior to installing shaft in framehalves.·Ratchet pawl may have to be pushed up to engage teeth on ratchet gear wheninstalling drum assembly.(9)Install drum (12), brake disc (11), and shaft (4) on frame halves (9 and 10).(10)Install two washers (8), spacers (7), screws (6), and locknuts (5) on frame halves (9 and 10). Do not overtightennuts.(11)Install spacer (3), two jamnuts (I), winch handle (2), and jamnut (1) on shaft (4). Tighten jamnuts 35 to 45 lb-ft (47- 61 Nm).4-341
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business