(4) Unpacking. Unpack all small components packaged and stored around the larger components. These
components can easily be lifted and removed from the packing skid by one or two workmen.
NOTE
Be sure all components are accounted for. Check all packaging material for loose parts
before discarding.
( 5 ) Servicing. Remove all protective compounds and covering such as waxed paper, waterproof tape, and
barrier material and tape. Using dry wiping cloths, remove all preservatives and greases from unpainted,
threaded, or exposed surfaces.
( 6 ) Inspection.
(a) Unwrap and examine separately wrapped items to ensure they are in serviceable condition.
( b ) Visually inspect all components for damage. Check for dents, cracks, broken parts, and loose or kinked
connections. Report damaged items on DD Form 6, Packaging Improvement Report. Marine Corps
users shall report damaged shipments in accordance with MCO P4600.14.
( c ) Check bill of lading to ensure that all parts have been supplied. Report all discrepancies in accordance
with instructions contained in DA PAM 738-750. Marine personnel refer to MCO P4610.19.
4-3. SET-UP. Prepare the equipment contained in the five water distribution systems for use as follows.
NOTE
Disregard instructions for equipment not contained in your particular equipment con-
figuration. Refer to table 4-1.
a. 350 GPM Pump Assembly. Prepare the 350 GPM pump assy for operation in accordance with instructions
contained in TM 5-4320-226-14.
b. 125 GPM Pump Assembly. The 125 GPM pump assy consists of a 3-horsepower engine and a 125 GPM
pump.
(1) Prepare 3-horsepower engine for operation in accordance with instructions contained in TM
5-2805-257-14.
( 2 ) Prepare 125 GPM pump for operation in accordance with instructions contained in TM 5-4320-208-12.
c.
d.
e.
f.
4-4
Hypochlorination Unit. The Hypochlorination Unit is ready for use following uncrating. Instructions for
mixing chlorine solution are on the instruction plate. Prepare the Hypochlorination Unit for operation in
accordance with instructions on the instruction plate.
50,000-Gallon Water Tanks. Prepare the 50,000-gallon water tanks for use in accordance with instructions
contained in Uniroyal Technical Manual CM 63504-3-49.
20,000-Gallon Water Tanks. Prepare the 20,000-gallon water tanks for use in accordance with instructions
contained in Goodyear Aerospace Publication 5-19-19.
Kit, Valves, and Hose Assemblies. All kits, valves and hose assys are ready for use following uncrating,
Do not remove the protective plugs and caps until installation. Ensure all valve assys are closed prior to
installation in the system.
Change 1