Home
Download PDF
Order CD-ROM
Order in Print
SECTION II. DEFINITION OF UNUSUAL TERMS (cont) - TM-5-5430-211-13P_155
ALPHABETICAL INDEX (cont)
TM-5-5430-211-13P Tank Assembly Fabric Collapsible POL 10 000 Gallon (37 800 Liter) Manual
Page Navigation
143
144
145
146
147
148
149
150
TM 5-543
0-
211-13 & P
ALPHABETICAL INDEX
Subject, Page
A
Assembly and Preparation for Use, 2-6
C
Characteristics of Tank, 1-2
Checks and Services, Preventative Maintenance:-
Operator/Crew, 2-3
Organizational, 3-6
Controls and Indicators, Operator's, 2-1
D
Damage to Tank Body
Classification of, 3-57
Data, Equipment, 1-4
Destruction of Army Material to Prevent
Enemy Use, 1-1
Description, Equipment, 1-2
Discharge Assembly
Cleaning of, 3-42
Removal of, 3-39
Inspection of, 3-15, 3-41
Installation of, 2-12, 3-43
Water Leaks from, 3-15
Drain Assembly
Cleaning of, 3-51
Removal of, 3-49
Inspection of, 3-16, 3-50
Installation of, 2-10, 3-51
Water Leaks from, 3-16
Draining of tank, 3-68
Drain Valve
Cleaning of, 3-56
Inspection of, 3-55
Relocation of, 3-56
Dusty Conditions
Operation in, 2-17
E
Emptying of Tank, 3-67
Equipment Data
, 1-4
Equipment Description
, 1-2
Expendable Items, F-1
External Components
Location and
Description, 1-3
Extreme Heat
Operation in, 2-16
F
Filler Assembly
Cleaning of, 3-32
Removal of, 3-29
Inspection, 3-14, 3-31
Installation, 2-12, 3-33
Warning, 2-13, 3-37
Water Leaks from, 3-
14
Filling of Tank, 2-15
G
Gate Valve Assembly 4"
Cleaning of, 3-64
Disassembly of, 3-62
Inspection of, 3-63
Installation of, 3-65
General Information, 1-1
Removal of, 3-54
Index 1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business