TM 5-5430-211-13 & PSubject, PageRRate of Filling of Tank, 2-15Receipt of Equipment, Service on, 3-1Repair of Tank Body, 3-57, 4-2Repair Parts, C-9 to C-23SSalt Water Areas, Operation in, 2-18Service on Receipt of Equipment, 3-1Shipment, Preparation for, 3-67Site, Preparation of, 2-6Slope, Maximum of Site, 2-6Snowy Conditions, Operation in, 2-17Storage, Preparation for, 3-67TTank BodyDamage Classification, 3-57Leaks from, 3-17Repair of Leaks, 3-58, 4-2Tank, Installation, 2-6Tank, Uncrating, 2-7Tools List, B-6Torque Limits, H-1Troubleshooting, Organizational, 3-12UUncrating of Tank, 2-7Unusual Conditions, Operation in, 2-16Usual Conditions, Operation in, 2-6Unrolling of Tank, 2-9VVent AssemblyCleaning of, 3-25Removal of, 3-22Inspection, 3-13, 3-24Installation of, 2-14Reassembly of, 3-25Water Leaks from, 3-13WWindy Conditions, Operation in, 2-17XYZIndex 3/(Index 4 Blank)
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business