TM 5-5430-211-13 & P
Subject, Page
H
Height of Tank, Maximum, 2-2
I
Improvement Recommendations, i, 1-2
Inspection, Organizational
Maintenance, 3-19
Discharge Assembly, 3-15, 3-41
Drain Assembly, 3-16, 3-50
Filler Assembly, 3-14, 3-31
Gate Valve 4', 3-63
Vent Assembly, 3-13
Water Tank, 3-17
Installation
Discharge Assembly, 2-12
Drain Assembly, 2-10
Filler Assembly, 2-12
Tank, 2-6
Vent Assembly, 2-14
Instructions, Operating, 2-1
L
Leaks, Classification of, 2-3, 3-6
Leaks from
Discharge Assembly, 3-15
Drain Assembly, 3-16
Filler Assembly, 3-14
Tank Body, 3-57
Vent Assembly, 3-13
Leaks, Repair of, 3-57, 4-2
Testing for, 4-5
Location of External Components, 1-3
M
Maintenance Allocation Chart, B-5
Maintenance Inspection. 3-19
Subject, Page
Maintenance Procedures
Discharge Assembly, 3-38
Drain Assembly, 3-48
Drain Valve, 3-54
Drain Hose, 3-49, 3-50
Filler Assembly, 3-28
Gate Valve 4", 3-61
Tank Body, 3-57
Maintenance Procedures,
Organizational, 3-18
Maximum Height of Tank, 2-2
Maximum Rate of Filling, 2-15
Maximum Slope of Site, 2-2
0
Operator's Controls & Indicators, 2-1
Operating Instructions, 2-1
Operation Under Usual Conditions, 2-6
Operation Under Unusual Conditions,
Dusty Conditions, 2-17
Extreme Heat Conditions, 2-16
Snowy Conditions, 2-17
Windy Conditions, 2-17
Salt Water Areas, 2-18
Organizational Maintenance
Procedures, 3-18
Organizational PMCS, 3-6
Organizational Troubleshooting, 3-12
P
Packing of Tank, 3-68
Preparation for Use, 2-6
Preparation of Site, 2-6
Pressure Relief Cap, 2-5, 3-10
Preventive Maintenance Checks and
Services
Operator/Crew, 2-3
Organizational, 3-6
Index 2