TM 5-5430-211-13 & P
3-13
VENT ASSEMBLY-CONTINUED
ITEM
ACTION
REMARKS
INSTALLATION-CONTINUED
3.
Coupling half,
Move the camlock arms to the
female threaded.
open position (1). Place on the
flanged coupling.
Move the arms to the closed
position (2).
4.
2 inch pipe
Screw in place
HAND TIGHT ONLY
5.
Relief Cap
Screw in place
Check the flap moves
easily.
HAND TIGHT ONLY
Flap must rest in the
down position.
6.
Completed Vent
Check for absence of leaks when
Assembly
tank is refilled with water.
3-27