TM 9-2330-267-14&P
4-48. FAUCET BOX ASSEMBLY MAINTENANCE (Cont).
1.
2.
3.
4.
5.
Position fastener (14) on box (7) and install two
screws (13), new Iockwashers (15), and nuts (16).
Position bracket (11) on access cover (10) and
install two screws (12), new Iockwashers (9), and
nuts (8).
Position hinge (6) on access cover (10) and install
three screws (5), new Iockwashers (18), and nuts
(17).
Position access cover (10) and hinge (6) on box
(7) and install three screws (5), new Iockwashers
(18), and nuts (17).
Secure fastener (14) in bracket (11).
d. INSTALLATION
1.
Position faucet box assembly (1) on frame assembly.
2.
Install four bolts (4), new Iockwashers (3), and nuts (4).
FOLLOW-ON TASKS:
l Install piping and faucets (para 4-58).
TA507050
4-89