TM 10-4320-303-13
2.8.1 Procedures for Preparation for Movement of TWDS. (Continued)
j. Pack all components for the two storage assemblies, except 20,000 gallon pillow tanks, together in
one crate. Collect all components for both storage assemblies and all packing materials at a single
site before repacking crate.
k. Pack all components for two distribution points, except 125 GPM pumping assemblies, in one crate.
Refer to applicable technical manual for preparation for movement of 125 GPM pumping assembly.
Collect all components for both distribution points at a single site before repacking crate.
l. Pack all components for the 10-mile hoseline segment, except for hoseline and flaking boxes, in one
crate. Collect all 10-mile hoseline segment components at a single site before repacking crate.
m. Packing TWDS requires the following general steps:
(1) Remove lids from crates. As required, remove blocking, bracing, anchoring, packing
materials, and fiberboard and plywood boxes stored in each crate.
(2) Return components to original containers, reference paragraph 2.3.4.
(3) Pack fiberboard boxes in plywood boxes.
(4) Install blocking, bracing, and anchoring securing contents within each crate as required.
(5) Install plywood sheathing on top of each crate. Nail down plywood sheathing.
(6) Roll out polyethylene barrier and position over plywood sheathing on top of each crate.
(7) Install cross-sheathing boards on top of each crate. Nail down cross-sheathing boards.
n. After repacking, TWDS is ready for movement to another location.
2.8.2 Preparation for Movement of 10-Mile Hoseline.
2.8.2.1 Disassembly and Packing Requirements.
a. Disassembly for the 10-mile hoseline segment requires sufficient tools, equipment, and personnel to
perform the tasks outlined in paragraph 2.3.10. The displacement and evacuation kit, and the
packing kit will be required to pack hoseline segments in flaking boxes. If a forklift is not available,
the lifting sling will be required to load, unload, and stack flaking boxes.
b. When flaking boxes are returned to packing site, stack them in groups of four. Pack each group in
crate marked HOSE ASSEMBLY, 6 INCH, 500 FEET. (Number of groups packed in crates will
depend on number of hoseline segments used during TWDS operation.) Reference Table 2-11 for
the total number, size, and type of components packed in the "10-MILE SEGMENT" Crate. Repack
components that were removed for TWDS operation and/or disassembly.
2.8.2.2 Disconnecting and Evacuating Hoseline.
NOTE
Begin evacuating hoseline at lead pumping station and proceed downline.
a. Remove grooved-end pipe quick disconnect coupling clamp (Figure 2-55, 1) (para 2.3.3.1) connecting
end of hoseline segment (2) to next downline hose segment (3) or swivel joint.
2-90