TM 10-4320-303-13
Figure 2-60. Pullboard Flange and Coupling Sleeve Installation.
d. Remove the following from packing kit: 2 hose-retaining clamps, 2 pullboard halves, 2 pullboard
flanges, 1 coupling sleeve, 14 hex nuts, 14 flat washers, 8 square-neck bolts, 6 cap screws, 14 self-
locking nuts, 1 chain hoist, 2 eyebolts, 4 nuts, and 4 flat washers.
(1) Remove screws on front of flaking box that secure tie bar to box.
(2) Lift and remove tie bar from box.
NOTE
Steps e through m are for pullboard assembly.
e. Align holes on left pullboard flange (Figure 2-60, 1) with holes on pullboard half
(2).
2-95