TM 10-4320-303-132.8.2 PreparationforMovementof10-MileHoseline. (Continued)au. Push down on two toggle levers (Figure 2-63, 5) and remove hose retaining brackets (1) (installed instep ai.).av. Remove nut (Figure 2-61, 5), eyebolt (2) and nut (1) from rear of flaking box assembly (8).aw. Load and nest empty flaking box assembly on top of full flaking box assembly (8). Repeating stepsn through aw, pack next length of hoseline. Continue this procedure until all remaining lengths ofhoseline have been packed.ax. As flaking box assemblies are packed, transport them to lead pumping station installation site forpacking in crates.2.8.2.4 PreparationforMovementofSuspensionDevice.NOTESet aside all removed components for repacking.a. Remove 6 inch grooved pipe coupling (para 2.3.2.1) connecting upline hoseline length to suspendedhoseline length.b. Install 6 inch grooved pipe coupling (para 2.3.2.2) on leading end of suspended hoseline length.c. Repeat steps a and b with trailing end of suspended hosel:ine length and downline hoseline segmentinstalling 6 inch grooved pipe coupling on leading end of downline segment.Figure 2-65. Disassembly of Suspension Device.2-100
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business