TM 10-4320-303-13
2.8.2 Preparation for Movement of 10-Mile Hoseline. (Continued)
au. Push down on two toggle levers (Figure 2-63, 5) and remove hose retaining brackets (1) (installed in
step ai.).
av. Remove nut (Figure 2-61, 5), eyebolt (2) and nut (1) from rear of flaking box assembly (8).
aw. Load and nest empty flaking box assembly on top of full flaking box assembly (8). Repeating steps
n through aw, pack next length of hoseline. Continue this procedure until all remaining lengths of
hoseline have been packed.
ax. As flaking box assemblies are packed, transport them to lead pumping station installation site for
packing in crates.
2.8.2.4 Preparation for Movement of Suspension Device.
NOTE
Set aside all removed components for repacking.
a. Remove 6 inch grooved pipe coupling (para 2.3.2.1) connecting upline hoseline length to suspended
hoseline length.
b. Install 6 inch grooved pipe coupling (para 2.3.2.2) on leading end of suspended hoseline length.
c. Repeat steps a and b with trailing end of suspended hosel:ine length and downline hoseline segment
installing 6 inch grooved pipe coupling on leading end of downline segment.
Figure 2-65. Disassembly of Suspension Device.
2-100