2.8.2 Preparation for Movement of 10-Mile Hoseline. (Continued)
Figure 2-66. Disassembly of Road Crossing Guard.
c. Clean road crossing guards (1) and transport them to lead pumping installation site for final packing.
2.8.2.6 Preparation for Movement of Pressure-Reducing Valve Assembly.
Figure 2-67. Disassembly of Pressure-Reducing Valve Assembly.
NOTE
· Set aside all removed components for repacking.
Notify unit maintenance for removal of threaded pipe fittings.
a. Remove grooved-end quick disconnect coupling clamp (Figure 2-67, 1) (para 2.3.3.1) connecting
pressure-reducing valve assembly (2) to downline hoseline segment (3).
2-102