TM 10-4320-303-132.8.2 PreparationforMovementof10-MileHoseline. (Continued)Figure 2-66. Disassembly of Road Crossing Guard.c. Clean road crossing guards (1) and transport them to lead pumping installation site for final packing.2.8.2.6 PreparationforMovementofPressure-ReducingValveAssembly.Figure 2-67. Disassembly of Pressure-Reducing Valve Assembly.NOTE· Set aside all removed components for repacking.Notify unit maintenance for removal of threaded pipe fittings.a. Remove grooved-end quick disconnect coupling clamp (Figure 2-67, 1) (para 2.3.3.1) connectingpressure-reducing valve assembly (2) to downline hoseline segment (3).2-102