TM 10-4320-303-13ah. Push down on two toggle levers (5) and remove two hose-retaining brackets (1) (installed in stepad).ai. Install two hose-retaining brackets (1) one or two folds in front of pullboard assembly (2).aj. Push up on two toggle levers (5) and lock hose-retaining brackets (1) against metal rim (3) on insideof flaking box assembly (4).ak. Release chain (6) on hoist (7). Remove pullboard assembly (2) from hoist (7). Set pullboardassembly (2) and hoist aside (7).al. Remove 6 inch grooved pipe coupling (9) (para 2.3.2.1) on leading end of hoseline (8). Remove endcap (10).am. Place plastic cap on leading end of hoseline (8).an. Repeat steps al and am for trailing end of hoseline (8)ao. Install 6 inch grooved pipe coupling (9) (para 2.3.2.2) on end of trailing end of hoseline (8).ap. Deliver end caps and grooved pipe coupling (removed in step al) to crews evacuating hoseline.Figure 2-64. Tailgate Assembly Installation.aq. Fold ends (Figure 2-64, 1) of hoseline (2) into flaking box assembly (3).ar. Insert tailgate assembly (4) into cleats on lower frame of flaking box assembly (3).as. Install tie bar (5) on flaking box assembly (3) so that tailgate assembly (4) fits into cleats on tie bar(5).at. Install two screws (6) on rear of flaking box assembly (3). Tighten two screws (6) until tie bar (5) issecurely fastened to flaking box assembly (3).2-99
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business