TM 10-4320-303-13
ah. Push down on two toggle levers (5) and remove two hose-retaining brackets (1) (installed in step
ad).
ai. Install two hose-retaining brackets (1) one or two folds in front of pullboard assembly (2).
aj. Push up on two toggle levers (5) and lock hose-retaining brackets (1) against metal rim (3) on inside
of flaking box assembly (4).
ak. Release chain (6) on hoist (7). Remove pullboard assembly (2) from hoist (7). Set pullboard
assembly (2) and hoist aside (7).
al. Remove 6 inch grooved pipe coupling (9) (para 2.3.2.1) on leading end of hoseline (8). Remove end
cap (10).
am. Place plastic cap on leading end of hoseline (8).
an. Repeat steps al and am for trailing end of hoseline (8)
ao. Install 6 inch grooved pipe coupling (9) (para 2.3.2.2) on end of trailing end of hoseline (8).
ap. Deliver end caps and grooved pipe coupling (removed in step al) to crews evacuating hoseline.
Figure 2-64. Tailgate Assembly Installation.
aq. Fold ends (Figure 2-64, 1) of hoseline (2) into flaking box assembly (3).
ar. Insert tailgate assembly (4) into cleats on lower frame of flaking box assembly (3).
as. Install tie bar (5) on flaking box assembly (3) so that tailgate assembly (4) fits into cleats on tie bar
(5).
at. Install two screws (6) on rear of flaking box assembly (3). Tighten two screws (6) until tie bar (5) is
securely fastened to flaking box assembly (3).
2-99