TM 10-4320-303-132.8.2 PreparationforMovementof10-MileHoseline. (Continued)x. Remove grooved-end pipe quick disconnect coupling clamp (8) (para 2.3.3.1) connecting end cap (3)with pneumatic coupler (4) to nipple (9).y. Remove grooved-end pipe quick disconnect coupling clamp (10) (para 2.3.3.1) connecting nipple (9)to hoseline segment (7).NOTEEnd caps must be installed on collapsed hoseline to prevent hose from expandingbefore it is packed.z. Connect end cap (Figure 2-57, 1) to hoseline segment (Figure 2-58, 7) using grooved-end pipe quickdisconnect coupling (10) (para 2.3.3.2).aa. Repeat steps a through z for each downline hoseline segment. Move air compressor down two hoselengths. Evacuate trailing hose then lead hose length to minimize number of times air compressor isto be moved.ab. When a hoseline length has been evacuated, collapsed, and capped, it is ready for packing in aflaking box.ac. When a swivel joint is removed, return it and one grooved-end pipe quick disconnect coupling clampto lead pumping station installation site.2.8.2.3 Repacking Hoseline Segments in Flaking Box Assemblies.CAUTIONClear sharp objects out of flaking box before packing. Any object pressed againsthose during packing could puncture it.a. Clean empty flaking box assembly (Figure 2-59, 1).Figure 2-59. Flaking Box Assembly Preparation.b. Perform steps a and b or c of paragraph 2.3.8.4 to load empty flaking box on truck.c. Transport empty flaking box and packing kit to leading end of first hoseline length.2-94
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business