TM 10-4320-303-13
o. Place eyebolt (2) through hole in permanent end wall (3) of flaking box assembly (4). Place nut (5)
on eyebolt (2). Tighten nut (5) until eyebolt (2) is securely fastened to flaking box assembly (4).
CAUTION
Clear sharp objects out of flaking box before packing. Any object pressed against
hose during packing could puncture it.
p. Place leading end of hose (6) at left front corner (7) of flaking box assembly (4). Leave about 3 feet
of hose dangling beyond front of flaking box assembly (4).
q. Route hose (6) along left side and then across rear (8) off flaking box assembly (4).
r. At right rear corner (9) of flaking box assembly (4), fold hose (6) back to left rear corner (10). Then
fold hose back to right rear corner (9).
s. Continue to fold hose (6) in a right-to-left/left-to-right pattern. Make every other fold 1/2 inch shorter
than width of flaking box assembly (4).
t. Stop flaking hose (6) after about 150 feet of hose (6) is in flaking box assembly (4).
Figure 2-62. compress Hoseline.
u. Place pullboard assembly (Figure 2-62, 1) against hose (2). Make sure eyebolt (Figure 2-60, 14) on
pullboard assembly (Figure 2-62, 1) faces eyebolt (3) on rear of flaking box assembly (4). Position
pullboard flanges (Figure 2-60, 1 and 6) beneath metal rim (Figure 2-62, 5) on inside of flaking box
assembly (4).
v. Attach hook (6) of chain hoist (7) to eyebolt (3) in rear of flaking box assembly (4).
w. Attach hook (8) of chain hoist (7) to eyebolt (Figure 2-60, 14) on pullboard assembly (Figure 2-62, 1).
2-97