TM 10-4320-303-13o. Place eyebolt (2) through hole in permanent end wall (3) of flaking box assembly (4). Place nut (5)on eyebolt (2). Tighten nut (5) until eyebolt (2) is securely fastened to flaking box assembly (4).CAUTIONClear sharp objects out of flaking box before packing. Any object pressed againsthose during packing could puncture it.p. Place leading end of hose (6) at left front corner (7) of flaking box assembly (4). Leave about 3 feetof hose dangling beyond front of flaking box assembly (4).q. Route hose (6) along left side and then across rear (8) off flaking box assembly (4).r. At right rear corner (9) of flaking box assembly (4), fold hose (6) back to left rear corner (10). Thenfold hose back to right rear corner (9).s. Continue to fold hose (6) in a right-to-left/left-to-right pattern. Make every other fold 1/2 inch shorterthan width of flaking box assembly (4).t. Stop flaking hose (6) after about 150 feet of hose (6) is in flaking box assembly (4).Figure 2-62. compress Hoseline.u. Place pullboard assembly (Figure 2-62, 1) against hose (2). Make sure eyebolt (Figure 2-60, 14) onpullboard assembly (Figure 2-62, 1) faces eyebolt (3) on rear of flaking box assembly (4). Positionpullboard flanges (Figure 2-60, 1 and 6) beneath metal rim (Figure 2-62, 5) on inside of flaking boxassembly (4).v. Attach hook (6) of chain hoist (7) to eyebolt (3) in rear of flaking box assembly (4).w. Attach hook (8) of chain hoist (7) to eyebolt (Figure 2-60, 14) on pullboard assembly (Figure 2-62, 1).2-97
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business