TM 10-4320-303-13
2.8.2 Preparation for Movement of 10-Mile Hoseline. (Continued)
f. Install four square-neck bolts (3), flat washers (4), and self-locking nuts (5) in holes.
g. Tighten each nut (5) until heads on bolts (3) are flush with surface of pullboard half (2).
h. Repeat steps e through g to install right pullboard flange (6) on second pullboard half (7).
i. Place pullboard halves (2 and 7) in coupling sleeve (8). Align holes in pullboard halves (2 and 7) with
holes in coupling sleeve (8).
j. Install six cap screws (9), flat washers (10), and self-locking nuts (11) in holes.
k. Tighten each self locking nut (11) until pullboard halves (2 and 7) are firmly secured in coupling
sleeve (8).
l. Install nut (12) and flat washer (13) on eyebolt (14).
NOTE
When installing eyebolt through coupling sleeve, make sure eyebolt and flanges
are on opposite sides of pullboard.
m. Place eyebolt (14) through hole in top of coupling sleeve (8). Install flat washer (15) and nut (16).
Figure 2-61. Start Hoseline Packing.
n. Install nut (Figure 2-61, 1) on eyebolt (2). Turn nut (1) to its limit of travel.
2-96