TM 10-4320-303-13WARNINGWhen removing saddle assemblies, manually support hose until assemblies havebeen removed.d. Remove nut (Figure 2-65, 1), bolt (2), saddle (3), and shackle (4) from each saddle assembly tooutside of upline tripod (5).e. Install bolts (2) through saddles (3) and shackles (4).f. Install nut (1) on bolt (2). Tighten nut (1).g. Repeat steps d through f for each saddle assembly to outside of downline tripod (6).h. Remove three or more U-bolt clamps used to secure end shackles to wire rope.i. Pull hose (7) across span. Saddles (3) should drag with hose (7) along wire rope (8).j. As saddles (3) arrive at pulley block (9) on tripod tower (5), perform steps d through f.k. After all saddles (3) have been removed and hose (7) has been retrieved, loosen turnbuckles (10) torelease tension on wire rope (8).l. Remove turnbuckles (10) from ends of wire rope (8).m. Remove turnbuckles (10) from stakes (11) and remove stakes (11).n. Pull wire rope (8) across span and coil it.o. Remove two nuts (Figure 2-39, 4), clamps (5), U-bolts (6) and thimble (3) from each end of wire rope(Figure 2-65, 8).p. Install one clamp (Figure 2-39, 5) and two nuts (4) on each U-bolt (6).q. Remove pulley blocks (Figure 2-65, 9) from tripods (5 and 6).r. Disassemble tripods (5 and 6).s. Locate chests for suspension kits and remove any contents.t. Wipe out inside of chest and clean kit items.u. Using loading diagram on chest lid, pack kit items as indicated.v. Transport suspension kit chest to lead pumping station installation site for final packing.2.8.2.5 PreparationforMovementofRoadCrossingGuards.NOTERoad crossing guards should be removed and packed after buried hoseline hasbeen pulled free from guards.a. Dig out road crossing guards (Figure 2-66, 1).b. If planks (2) were nailed to bottom of road crossing guards (1), remove nails and remove planks (2).2-101
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business