TM 10-4610-243-13
2-15. PREPARATION FOR MOVEMENT - cont.
m.
Packing.
(1)
Open twelve tricon containers. Refer to the applicable TM.
(2)
Pack water system components into tricons. If possible, keep similar components stowed together. For
example, pack all 4-inch discharge hoses together, then all the 4-inch gate valves, 2-inch discharge
hoses and so on until all components are stowed.
(3)
Pack hypochlorination units into tricons.
(4)
Pack 125 GPM pumps into tricons.
(5)
Pack 350 GPM pumps into tricons.
(6)
Close twelve tricon containers Refer to 'I'M55-8145-200-13&P.
2-92