TM 10-4610-243-13
2-10. ASSEMBLY AND PREPARATION FOR USE - Cont
h. Assemble 350 Gpm Pump Connection Kit (Water Source). Refer to figure 2-15.
WARNING
To prevent contamination of drinking water, make sure protective caps and plugs are
installed when components are not in use. Do not remove caps and plugs from
components until couplings are ready to be connected.
NOTES
Install all gate valves with hand wheel in upright position and valve fully closed.
Suction hoses are noncollapsible and discharge hoses are collapsible.
All components in this kit are 4-inch diameter.
(1)
Connect 10 foot discharge hose (3) from connection kit 4 to tee (1).
(2)
Connect 10 foot discharge hose (2) from connection kit 5 to tee (1).
(3)
Connect water meter (4) to tee (1).
(4)
Connect 20 foot discharge hose (5) to water meter (4).
(5)
Assemble and prepare hypochlorination unit for use. Refer to the applicable TM.
(6)
Position hypochlorination unit (6) in water system.
(7)
Connect 20 foot discharge hose (5) to male (outlet) coupling on hypochlorination unit (6).
(8)
Connect 20 foot discharge hose (7) to female (inlet) coupling on hypochlorination unit (6).
(9)
Connect tee (8) to 20 foot discharge hose (7).
(10)
Connect 20 foot discharge hose (9) to tee (8).
(11)
Connect 4-inch gate (10) to 20 foot discharge hose (9).
(12)
Connect 20 foot discharge hose(11) to 4-inch gate valve (10).
(13)
Assemble and prepare 350 gpm pump (12) for use. Refer to the applicable TM.
(14)
Position 350 gpm pump (12) in water system.
(15)
Connect end of 20 foot discharge hose (11) to male (discharge) coupling on 350 gpm pulp (12).
2-43