2-12 OPERATING PROCEDURES-- cont.
Fill mode
NOTE
The following procedure describes filling of collapsible water tank T1. Additional
tanks, T2 through T16, may be filled by opening their corresponding gate valves
(T2A through T16A).
(1)
Open gate valves V1, V2, V3 and V4.
(2)
Open inlet gate valve T1A on tank T1.
(3)
Start and operate the 350 gpm pump P1. Refer to the applicable TM.
(4)
If additional pumping capacity is required, start and operate 125 gpm pump P2. Refer to the
applicable TM.