TM 10-4610-243-13
2-12. OPERATING PROCEDURES - cont.
(16)
To dispense water through hose nozzle connection kits, proceed as follows:
(a)
Open gate valves V17, V18, V19 and V20.
(b)
Place distribution nozzles in water storage containers and squeeze distribution nozzle control
handles to dispense water.
(c)
When water storage containers are full, release control handles on distribution nozzles.
(d)
Close gate valves V17, V18, V19 and V20.
(17)
To dispense water through hose and nozzle connection kits, proceed as follows:
(a)
Open gate valves V21, V22 and V23.
(b)
Place distribution nozzles in water containers and squeeze distribution nozzle control handles to
dispense water.
(c)
When water storage containers are full, release control handles on distribution nozzles.
(d)
Close gate valves V21, V22 and V23.
(18)
When discharge mode is complete, shutdown 350 gpm pump P3 (refer to the applicable TM) and 125
gpm pump P4 (refer to the applicable TM).
d.
Shutdown. Refer to figure 2-24.
(1)
Shut down 350 gpm pump P1. Refer to the applicable TM.
(2)
Shutdown 125 gpm pump P2. Refer to the applicable TM.
(3)
Close gate valves V1, V2, V3 and V4.
(4)
Shut down hypochlorination unit H1. Refer to the applicable TM.
(5)
Close water tank inlet gate valves T1A through T16A.
(6)
Close water tank outlet gate valves T1B through T16B.
(7)
Shutdown 350 gpm pump P3. Refer to the applicable TM.
(8)
Shutdown 125 gpm pump P4. Refer to the applicable TM.
(9)
Close gate valves V5, V6, V7 and V8.
(10)
Shut down hypochlorination unit H2. Refer to the applicable TM.
2-65