TM10-5430-229-13&P
CHAPTER 4
UNIT MAINTENANCE INSTRUCTIONS
Section I. REPAIR PARTS, SPECIAL TOOLS, TEST, MEASUREMENT, AND
DIAGNOSTIC EQUIPMENT (TMDE), AND SUPPORT EQUIPMENT
4-1. COMMON TOOLS AND EQUIPMENT. For authorized common tools and equipment, refer to the Modified Table of
Organization and Equipment (MTOE), CTA 50-970, or CTA-8-100, as applicable to your unit. Unit maintenance for the
WTSC will require the use of a Tool Kit, General Mechanic's, (Appendix B, Item 1) and Shop Equipment, General Auto-
motive, (Appendix B, Item 2).
4-2. SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT. Special tools are required for maintenance of the
equipment. These special tools are listed in the Special Tools section of the Maintenance Allocation Chart in Appendix B
of this technical Manual. Test, Measurement, and Diagnostic Equipment and Support Equipment include standard
equipment found in any maintenance
shop.
4-3. REPAIR PARTS. Repair parts needed by unit maintenance of the WTSC are listed and illustrated in the Repair
Parts and Special Tools List (RPSTL) provided in Appendix C to this technical manual.
Section II. SERVICE UPON RECEIPT AND PREPARATION FOR MOVEMENT
4-4. SITE AND SHELTER REQUIREMENTS. The WTSC should be assembled on a level area free of debris and large
rocks. Be sure that the site allows for enough room to assemble the tank storage chest and for packing or unpacking
water tanks into the WTSC.
4-5. SERVICE UPON RECEIPT OF MATERIAL. The following paragraphs contain the procedures for unloading, un-
packing, and general checking of the unpacked WTSC.
a.
Unloading. The WTSC is shipped In one package. The package may be lifted by fork-lift, crane, or sling. To
unload the WTSC, perform the following steps.
(1)
Check the shipping package for damage Damaged packages indicate probable damage to equipment.
(2)
Remove all blocking and tie downs that may have been used to secure the package onto the carrier.
4-1