TM 10-8110-202-13 & P5-5. TEST DRUMMATERIALS/PARTS: Drinking waterNOTEPRELIMINARY CONDITION: Drum completely assembled(para 5-4).1. Fill drum with drinking water in accordance with paragraph 2-3.2. Perform PMCS, Table 2-1. Check for leaks.Change 15-11
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business