TM 10-8110-202-13 & P2. Wash area with MEK.3. Using a buffing tool, thoroughlybuff an area 5 inches in alldirections from the edge of thehole.4. Remove buffing dust and washarea with MEK.NOTEUnder normal atmospheric conditions the cement will dryin 2 to 3 minutes. Excessive humidity will require longerdrying time. Do not mix applicator brushes with differentcements.5. Apply one coat of 3918 cement to entire buffed and cleaned area around hole. Allow cementto dry.6. Apply a second coat of 3918 cement to buffed7. Cut out four patches as follows:and cleaned area, and allow it to dry.a. Patch 1. Cut a patch from 42153 patch material that is 3 inches larger than the hole inall directions.b. Patch 2. Cut a patch from 42153 patch material that is 1/2 inch larger than patch 1 in alldirections.5-23
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business