TM 10-8110-202-13 & P
f. Position and center patch 2 over patch 1 with the cement side down.
g. Roll and stitch patch 2 thoroughly using a roller and stitcher.
NOTE
Exterior repair is now complete. Proceed to interior repair
instructions, following.
INTERIOR REPAIR:
1.
2.
3.
4.
5.
6.
7.
8.
Remove all dirt from area around hole to be repaired.
Wash with mild non-toxic detergent and water.
Using a buffing tool, thoroughly buff an area 5 inches in all directions from the edge of the hole.
Remove buffing dust and wash area with non-toxic detergent and water.
NOTE
Under normal atmospheric conditions the cement will dry
in 1 to 3 minutes. Excessive humidity will require longer
drying time. Do not mix applicator brushes with different
cements.
Apply one coat of PT-659 cement to entire buffed and cleaned area around hole. Allow cement
to dry.
Apply a second coat of PT-659 cement to buffed and cleaned area.
Cut out two patches as follows:
a. Patch 1. Cut a patch from PS-692 patch material that is 3 inches larger than the hole in
all directions.
b. Patch 2. Cut a patch from PS-692 patch material that is 1/2 inch larger than patch 1 in
all directions.
Apply the two patches over interior of hole as follows:
a.
b.
c.
d.
e.
Apply one coat of PT-589 cement to one side of patch 1 and allow to dry.
Position and center patch 1 over hole with the cement side down.
Roll and stitch patch 1 thoroughly using a roller and stitcher.
Apply one coat of PT-589 cement to top side of patch 1 and allow to dry.
Apply one coat of PT-589 cement to one side of patch 2 and allow to dry.
5 - 3 2
Change 1