TM 10-8110-202-13 & P2.3.4.5.6.7.5-30Wash area with MEK.Using a buffing tool, thoroughlybuff an area 5 inches in alldirections from the edge of thehole.Remove buffing dust and washarea with MEK.NOTEUnder normal atmospheric conditions the cement will dryin 1 to 3 minutes. Excessive humidity will require longerdrying time. Do not mix applicator brushes with differentcements.Apply one coat of PT-659 cement to entire buffed and cleaned area around hole. Allow cementto dry.Apply a second coat of PT-659 cement to buffed and cleaned area, and allow it to dry.Cut out two patches as follows:a. Patch 1. Cut a patch from PS-693 patch material that is 3 inches larger than the hole inall directions.Change 1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business