TM 10-8110-202-13 & P
2.
3.
4.
5.
6.
7.
5-30
Wash area with MEK.
Using a buffing tool, thoroughly
buff an area 5 inches in all
directions from the edge of the
hole.
Remove buffing dust and wash
area with MEK.
NOTE
Under normal atmospheric conditions the cement will dry
in 1 to 3 minutes. Excessive humidity will require longer
drying time. Do not mix applicator brushes with different
cements.
Apply one coat of PT-659 cement to entire buffed and cleaned area around hole. Allow cement
to dry.
Apply a second coat of PT-659 cement to buffed and cleaned area, and allow it to dry.
Cut out two patches as follows:
a. Patch 1. Cut a patch from PS-693 patch material that is 3 inches larger than the hole in
all directions.
Change 1