SERVICE MANUALTIMING, GEAR TRAIN & FRONT COVERSection 72.Insert the end of the indicator between any twoteeth of the gear to be measured.3.Move the gear by hand, slightly, then read dialindicator to determine backlash.NOTE: Backlash between any set of timing gearsshould not exceed 0.41 mm (0.016 in.). Any gearexceeding this value requires service.Remove the Idler Gear as follows:1.Remove the retainer bolt (1, Fig. 12), stub shaft(2) and bearing (3). A split ring prevents thebearing from coming off the stub shaft.2.Remove the idler gear (4, Fig. 1 2), bearing (5)and spacer (6) as shown.Figure 12. - Removing Idler Gear1.Retainer bolt4.Idler gear2.Stub shaft5.Bearing3.Bearing6.SpacerIf necessary, remove the Injection Pump Drive Gear asfollows:With Crankcase front cover off (Refer to Figures 13 and13a)1.Remove the three drive gear bolts (1).2.Remove the pump drive gear (2) from the dowelas shownFigure 13. - Removing Injection Pump Gear Enginesequipped w/UTDS (formerly AMBAC) Model 100 FuelInjection Pump (with front cover off)1.Drive gear bolts (3)2.Injection pump drive gearFigure 13a. - Removing Injection Pump Gear (Enginesequipped w/Robert Bosch Model MW Fuel InjectionPump) [with front cover off])1.Drive gear bolts (3)2.Injection pump drive gearCGES-185-3PRINTED IN UNITED STATES OF AMERICAPage 7
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business