Home
Download PDF
Order CD-ROM
Order in Print
TIMING, GEAR TRAIN & FRONT COVER - CONT - TM-5-3820-256-24-5_298
TIMING, GEAR TRAIN & FRONT COVER - CONT - TM-5-3820-256-24-5_300
TM-5-3820-256-24-5 Drilling System Well Rotary Truck Mounted Air Transportable 600 Feet Capacity Model LP-12 NSN 3820-01-246-4276 Manual
Page Navigation
263
264
265
266
267
268
269
270
271
272
273
SERVICE MANUAL
TIMING, GEAR TRAIN & FRONT COVER
Section 7
Figure 27a. - Injection Pump Timing Marks
1.
Timing pointer
2.
Timing mark
Figure 27c. - Drive Gear Bolt Slots
Figure 27b. - Tightening Drive Gear Bolts (Robert Bosch
Model MW
Fuel Injection Pump
)
1.
Idler gear
2.
Drive gear
3.
Socket wrench
4.
Drive gear bolts (3)
Figure 27d. - Engine to Injection Pump Timing on Pulley
*United Technologies Diesel Systems
(formerly AMBAC)
CGES-185-3
PRINTED IN UNITED STATES OF AMERICA
Page 14
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business