TM 5-3895-370-14&P2-14. ENGINE OPERATING PROCEDURES (CONT).(2)Turn key switch (3) on gage panel (4) fullyto the right.(3)Depress reset button (5) and start button(6) at the same time.(4)Once engine starts, release start button(6) while continuing to depress resetbutton (5).(5)Allow engine to idle for 30 seconds whileholding reset button (5) down.CAUTIONIf engine oil pressure has notreached 10 psi (69 kPa) after 60seconds of operation, shutdowndistributor by turning key switch fullyto the left (counterclockwise) andnotify unit maintenance.NOTEIf reset button is released beforeengine oil pressure reaches 10 psi(69 kPa), engine will stall.(6)When oil pressure gage (7) has reached10 psi (69 kPa), release reset button (5).(7)Allow engine to idle at 1200 RPM forapproximately 5 minutes.(8)Ensure that engine will run up to 2100RPM by temporarily turning throttle control(8) on control console (2) then returnengine RPM to 1200.(9)Perform operator PMCS proceduresdesignated During in the Interval column(Table 2-2).(10)Turn flow rate indicator light switch (9) toON.b.Engine Shutdown.Turn key switch (3) ongage panel (4) fully to the left (counterclockwise).2-28
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business