TM 5-3895-370-14&P
12-19. TRANSFERRING MATERIAL FROM SUPPLY TO STORAGE.
a.
Introduction. The following procedures are required to transfer material to storage from a supply tank. Before
accomplishing these procedures, circulate material within the system to warm up pump and piping. Refer to Circulating
Bituminous Material (para 2-20).
b.
Transferring from Supply to Storage.
NOTE
· Transferring material from supply to storage can only be accomplished after the
system has warmed sufficiently.
· If longer bituminous hoses are necessary, use 3-inch connectors, from storage
rack, to connect hoses together.
· Refer to para 2-16 for the proper and safe procedure to connect bituminous
hoses.
(1)
Connect hose (1) to distributor inlet port (2) and supply outlet port (3).
(2)
Connect hose (4) to distributor outlet port (5) and storage inlet port (6).
2-40