TM 9-2330-267-14&P
4-29. AXLE REPLACEMENT (Cont).
FOLLOW-ON TASKS:
l Connect handbrake cable (para 4-31).
l Install hydraulic lines (para 4-35).
l Install hub and brakedrum (para 4-45).
l Install shock absorbers (para 4-52).
l Bleed brakes (para 4-36).
4-47